Client
ASFiNAG Bau Management GmbH

Place of performance
Haimburg, Austria

Execution period
03/2022 – 11/2022

Contract value
€ 1.6 million

Back to Projects

A2 Haimburg Traffic Checkpoint

In the course of renovation works on the highway A2, the Völkermarkt-Ost traffic checkpoint, Haimburg exit, was re-equipped with electrical equipment.

The contract included the demolition of the existing diversion cross-sections and the new construction of the same, including foundations and cabling. The general electrical and control technology, the traffic control station, the traffic control system and the CN.as line were also part of the renovation measures in the open field.

Services in Detail

  • Traffic control system
  • Traffic sign support
  • Video surveillance
  • Information transmission and processing
  • Street lighting
  • Power distribution
  • Cabling
  • Earthing and equipotential bonding
  • Lightning protection system
  • Building and niche equipment and installation
  • Pipe and support systems, various constructions

Furthermore, STRABAG Infrastructure & Safety Solutions will provide long-term maintenance for the installed electrical systems (planned for 5 years). This guarantees the basis for safe operation of the tunnel system.