Client
ASFiNAG Bau Management GmbH

Place of performance
Ardning, Austria

Execution period
West tunnel 10/2011 – 07/2013
East tunnel 10/2014 – 12/2015

Contract value
€ 13.3 million

Back to Projects

A9 Bosruck Tunnel

On behalf of ASFiNAG, the existing tube of the Bosruck Tunnel on the A9 Phrynautobahn was extensively renovated and extended by a second tunnel tube. As the general contractor, STRABAG Infrastructure & Safety Solutions was responsible for the complete installation of the electrical equipment.

From energy distribution and lighting to the fire alarm system, general electrical engineering as well as safety and traffic control systems were implemented throughout the existing eastern tunnel and the newly constructed western tunnel over a total length of 5,500 meters.

Services in Detail

  • Traffic detection and control systems
  • Control technology
  • Video system with 140 cameras
  • Illumination of the entrance, the inner route (691 light points) and breakdown bays (50 light points)
  • Fire alarm system
  • Air quality measuring devices & control of tunnel ventilation
  • Acoustic tunnel monitoring
  • Dynamic public address system
  • Emergency call niches with emergency call systems
  • Data transmission facilities & Corporate Network (CN.as)
  • Medium-voltage system & UPS systems
  • Medium-voltage, low-voltage, and extra-low voltage cabling
  • Energy distribution incl. distribution planning
  • Barrier system in the front portal
  • Long-term maintenance of the installed systems