Client
ZÜBLIN Scandinavia AB / Boskalis for TRAFIKVERKET

Place of performance
Gothenburg, Sweden

Execution period
2014 – 2020

Contract value
approx. € 22 million

Back to Projects

Marieholm Tunnel Gothenburg, E&M Equipment

Züblin Scandinavia AB, a Swedish subsidiary of STRABAG SE, has been awarded the contract to build the Marieholm Tunnel, an immersed tunnel under the Göta River in the Swedish city of Gothenburg, as consortium leader of a joint venture. Subsequently, STRABAG Infrastructure & Safety Solutions was commissioned with the electromechanical equipment for the tunnel.

Since December 2020, the Marieholm Tunnel has connected the E45 Marieholm highway with the E6 Tingstad intersection in the district of Hisingen. The tunnel has a total length of around 500 meters, 300 meters of which run directly under the water. For this exciting project, three tunnel elements, each 100 meters long, were completed on site in a dry dock and lowered into the excavated riverbed at the final location. The tunnel sections adjacent to both sides of the immersed tunnel were constructed using the cut-and-cover method in deep excavation pits.

The construction of the Marieholm Tunnel significantly improved accessibility to the port of Gothenburg, Norra Älvstranden, and the western Hisingen industry. In addition, the existing Tingstad Tunnel, which had long since exceeded its capacity limit with over 120,000 vehicles a day, was relieved.

As part of the project, STRABAG Infrastructure & Safety Solutions installed around 1,800 tunnel lights and more than 300 electrically controlled traffic signs in the tunnel and the adjacent open field, and laid 278 km of power cables – to name just a few examples.

Services in Detail

STRABAG Infrastructure & Safety Solutions installed the following electromechanical systems:
  • Traffic infrastructure & control
    • The entire control system including data transmission equipment
    • Traffic data collection
    • Traffic control system incl. traffic sign supports
    • Video surveillance
  • Various electrical systems & installations
    • Radio system for secure communication within the tunnel and with the outside world
    • Tunnel lighting, object and accent lighting
    • Tunnel ventilation system, building ventilation and air conditioning
    • Fire alarm system
    • Hazard alarm system
    • Pump systems
    • ACI system (access control)
    • Building and niche installation
  • Sensors
    • Monitoring device for air conditions
    • Measuring devices for extinguishing water display
    • Measuring devices for the water protection system
  • Energy supply & distribution
    • Low and medium voltage system
    • Earthing and equipotential bonding
    • Cabling
    • Safety power supply
  • Structural measures & constructions
    • Doors and gates
    • Fire barriers
    • Pipe and support systems
    • Lifting gear in the company building
  • Maintenance

    Furthermore, STRABAG Infrastructure & Safety Solutions will provide long-term maintenance for the installed electrical systems (planned for 5 years). This guarantees the basis for safe operation of the tunnel system.